Go To Homepage
Search for:
  • About Us
    • History
    • Our Process
    • Certifications
    • Locations
    • Standard Terms and Conditions
  • Products
    • Seamless Pressure Vessels
    • Tube Trailers and Skids
    • DOT & ASME Assemblies
    • Cryogenic Equipment
    • Parts & Accessories
    • Vaporizers
  • Services
    • Acoustic Emission Testing
    • Ultrasonic Examination
    • Rehabilitation and Repair
    • Neck Thread Inspection
    • Hydrostatic Testing
  • Technical
    • Brochures
    • Specifications
    • Product Videos
  • Inventory
  • Blog
  • News
  • Employment
  • Contact
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • We Transfer
en English
ar Arabiczh-CN Chinese (Simplified)nl Dutchen Englishfr Frenchde Germanit Italianja Japaneseko Koreanpt Portugueseru Russianes Spanish
  • Blog
  • News
  • Employment
  • Contact
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • We Transfer
en English
ar Arabiczh-CN Chinese (Simplified)nl Dutchen Englishfr Frenchde Germanit Italianja Japaneseko Koreanpt Portugueseru Russianes Spanish
FIBA Technologies, Inc. Logo
  • About Us
    • History
    • Our Process
    • Certifications
    • Locations
    • Standard Terms and Conditions
  • Products
    • Seamless Pressure Vessels
    • Tube Trailers and Skids
    • DOT & ASME Assemblies
    • Cryogenic Equipment
    • Parts & Accessories
    • Vaporizers
  • Services
    • Acoustic Emission Testing
    • Ultrasonic Examination
    • Rehabilitation and Repair
    • Neck Thread Inspection
    • Hydrostatic Testing
  • Technical
    • Brochures
    • Specifications
    • Product Videos
  • Inventory
Search for:

Tag: UN Tubes

Authors

FIBA
FIBA Technologies
John Felbaum
Stephanie Puente

Requalifying DOT UN & 3-Series Tubes

DOT UN or ISO tubes that are manufactured in accordance with 49 CFR 178.71(j) or ISO 11120 will have a retest cycle of 10-years provided they are carrying Division 2.1 (flammable) or 2.2 (non-flammable) gases (excepting CO2). The retest cycle is 5 years for Division 2.3 (toxic) g...
Posted: Posted on January 22, 2018

DOT UN Tube Fill Pressure

DOT Regulations - Pressure DOT UN tubes manufactured per DOT regulation and ISO standard 11120 shall be filled in accordance with 49 CFR Section 173.302b(b), which states:  “UN pressure receptacles filling limits.  A UN pressure receptacle is authorized for the transportation...
Posted: Posted on January 22, 2018
Go To Homepage

FIBA Technologies, Inc

HQ: 53 Ayer Rd, Littleton, MA 01460

Get in Touch

  • 508 887 7100
  • 978 742 4908
  • info@fibatech.com

Products

  • Seamless Pressure Valves
  • Tube Trailers and Skids
  • DOT & ASME Assemblies
  • Cryogenic Equipment

Locations

  • California
  • Kentucky
  • Lousiana
  • Massachusetts
  • Ohio
  • Pennsylvania
  • Taiwan

Copyright © 2001-2018 FIBA Technologies, Inc. All Rights Reserved